title: Optimizing Industrial Bearing Cleaning in the Czech Republic
description: See how a custom dual-tank parts washer standardized industrial bearing cleaning, cut cycle times, and stopped chemical residues. Read our case study.
---

[Geicos blog](https://blog.geicosgroup.com/en)

# [Optimizing Industrial Bearing Cleaning in the Czech Republic](https://blog.geicosgroup.com/en/case-study-washer-e-1150)

 Written by [Geicos Group](https://blog.geicosgroup.com/en/author/test) | Nov 16, 2026, 3:05:11 PM

*How custom engineering a dual-tank Washer 1150 E POWER eliminated in-process cleaning bottlenecks for an industrial maintenance provider.*

Project Fact Sheet

Location **Brno, Czech Republic**

Industry **Industrial maintenance, workshops, and heavy-duty repair**

Core Business **Sales and service leasing of professional cleaning equipment and specialized detergents**

Treated Components **Medium-to-large industrial bearings**

## Objective: Standardizing Critical In-Process Cleaning

In the client’s overhaul and manufacturing workflow, industrial bearing washing serves as a critical intermediate stage prior to downstream assembly. The standard procedure faced three strict constraints:

01

### Preventing Chemical Residues on Parts

Initial degreasing with a water-based solution required an immediate, thorough rinse. The detergent surfactants—vital for stripping oils and heavy contaminants—could not be allowed to linger on the metal before downstream processing.

02

### Eliminating Line-Operator Error

The client required an intuitive, foolproof ("user-friendly") setup. The goal was to remove operator discretion over cycle times and temperatures by locking in wash parameters upfront, reducing manual intervention to loading and hitting start.

03

### Handling Heavy Workpieces Unobstructed

The medium-to-large dimensions of the bearings required top-loading via a jib crane or overhead hoist, which conflicted with the internal clearances of standard parts washers.

## Solution: From Field Testing to a Custom Dual-Tank System

The project was developed in close collaboration with the local distributor. The initial phase involved deploying a standard machine (Washer 1150) on-site to conduct empirical cycle-time testing and benchmark the ideal water-based degreasing chemistry.

Having mapped the operational bottlenecks on the floor, the Geicos engineering team re-engineered the **Washer 1150 E POWER (P40009.1)** into a custom two-stage platform:

✓

**Dual independent tank configuration:** Integration of two separate reservoirs equipped with dual high-flow, high-pressure pumps and distinct spray manifolds (one for heated alkaline degreasing, one for clean water rinsing).

✓

**Automated fluid routing:** To prevent rinse water from contaminating the detergent bath (and vice versa), airtight diverter solenoid valves were integrated to direct returning run-off to their respective tanks. The unit was also plumbed directly to the water mains for automated filling and drainage.

✓

**Hoist-loading layout:** Internal spray bars were dimensionally reconfigured to open up the top loading envelope, allowing effortless vertical loading of heavy parts via crane or hoist.

✓

**Tamper-proof digital control panel:** The interface was upgraded with programmable digital temperature controllers and timers. Shop supervisors pre-set and lock cycle durations and thermal profiles; line operators only interact with a streamlined "Start & Stop" control.

## Operational Results and Business Impact

Deploying the customized Washer 1150 eliminated critical maintenance bay inefficiencies:

### Standardized Cycle and Zero Chemical Carryover

Automating the wash, rinse, and dry sequence delivers spot-free bearings free of surfactant residues, ready for immediate assembly.

### Zero Operator Attendance During Washing

Manual bench adjustments were eliminated entirely: operators load the workpiece, press start, and attend to higher-value tasks while the cycle runs autonomously.

### Extended Chemical Bath Life

Hydraulic separation via dedicated solenoid valves prevents cross-contamination, substantially reducing chemical consumption and fluid disposal frequency.

### Fleet Scalability

Validating this configuration enabled the client to expand their rental fleet capacity and bid on demanding maintenance contracts, including public rail and transit infrastructure.

### Looking to standardize your in-process parts washing or need a custom setup for heavy workpieces?

*Contact Geicos Technical Engineering for an on-site application review.*

[TALK TO OUR APPLICATION ENGINEERS](https://www.geicosgroup.com/contacts/contacts/)

[View full post](https://blog.geicosgroup.com/en/case-study-washer-e-1150)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Geicos Group"
  },
  "dateModified" : "2026-11-16T15:05:11.354Z",
  "datePublished" : "2026-11-16T15:05:11Z",
  "headline" : "Optimizing Industrial Bearing Cleaning in the Czech Republic",
  "image" : {
    "@type" : "ImageObject",
    "height" : 2848,
    "url" : "https://25195059.fs1.hubspotusercontent-eu1.net/hubfs/25195059/P40032_1-Washer%201150%20double-003.jpg",
    "width" : 4272
  },
  "mainEntityOfPage" : "https://blog.geicosgroup.com/en/case-study-washer-e-1150",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Geicos blog"
  }
}
```